2014 - Panet Road/Molson Reconstruction and Twinning

Owner: City of Winnipeg | Value: 7.2 Million | Consultant: Dillon Consulting Ltd.

As one of the largest regional street projects in the City of Winnipeg in 2014 with the tightest schedule, this project required a tremendous amount of planning and recourses. Working with Dillon Consulting, Bayview Construction completed 1.6 km of twinned 9.2m concrete roadway with monolithic curb while juggling traffic in both directions and CP Rails demanding requirements.  Some of the major components included:

  • 25,000m3 excavation
  • 20,000m2 of pavement removal
  • 20,000m2 of slip-form and hand pour concrete paving
  • 4,000m2 of sidewalk
  • 40,000t of granular material
  • 500m of 900mm LDS

The sewer and water components of the project included new LDS installation, air release chamber construction, over a 750mm feeder main, as well as trenchless installation of large diameter piping under railway crossing. Extensive scheduling, up to 8 weeks in advance, was needed to coordinate with CP, MB Hydro, MTS and many other private business as well as daily meetings with the engineers on-site. The project was completed on schedule.

When you want it all, we do it all.

Our Story

Since 1992, Bayview has grown to meet the changing needs and opportunities in Manitoba's heavy construction industry.